I'll adjust the dates and try my best to update dead links to keep it up to date - but the message stays the same.
One of the last. Great history. USS WISCONSIN (BB-64). BTY, shipmates have a great website as well. Just don't like it too much.
As a final commentary - the USS OKLAHOMA (BB-37) was commissioned in 1916. The USS WISCONSIN (BB-64) in 1944. 28 years. Click that link above and come back.
The first TICONDEROGA class CG was commissioned 35 years ago. The next "ship of the line" to be commissioned will be the Flight IIA ARLEIGH BURKE Class Destroyer USS Thomas Hudner (DDG-116).
There are a couple of transformationalists that I have friendly exchanges with on-&-offline. Their constant refrain is that we are in a period of radical technological advancement.
That always bothers me - no, we are not. 1898-1918. 1916-1944. 1939-1962. Please. We are not even close to be in a period of quickening.
If we looked as technology as a tool and not an answer, we would save a lot of blood and treasure. Be humble.
No comments:
Post a Comment